Office relocation checklist for India: a 12-week plan

Updated 5 October 2026 · 10 min read

In short

Plan an office relocation about 12 weeks ahead: lock the new space and vendors first, then inventory and tag every asset, label crates by floor and desk, and move IT over a weekend with a written runbook. Finish with an audit that every tagged asset arrived, and a list of where everything went for admin and finance.

Who owns what

Name one move owner with the authority to decide, and one owner for each stream. Most office moves go wrong in the gaps between teams, not inside them.

StreamOwnerOwns
Overall moveAdmin / facilities headTimeline, budget, vendor contracts, communication
ITIT leadNetwork, servers, laptops, desktops, printers, data backup, access control
RecordsFinance or complianceFiles, statutory registers, record boxes, archive room
Each teamA team coordinatorPacking their desks and team cupboards, labelling, unpacking
Old premisesAdminLandlord handover, security deposit, utility closures

The 12-week timeline

Weeks 12–9: decide and book

  • Sign the lease for the new space; get floor plans and confirm power, network points and AC capacity
  • Review the old lease: notice period, restoration obligations, security deposit terms
  • Get quotes from at least three movers; ask how they handle IT equipment and liability
  • Book the internet line for the new office early — installation can take weeks
  • Plan seating: desk-wise layout for every team
  • Set the move dates; a Friday-evening-to-Sunday move avoids losing working days

Weeks 8–5: inventory and tag

  • List every asset that will move: furniture, IT, pantry, record boxes, signage
  • Decide what will not move — sell, donate, scrap or e-waste — and book the pickup
  • Tag every asset and crate with a code: floor, team and desk (e.g. F3-FIN-12)
  • Photograph the condition of furniture and expensive equipment before the move
  • Confirm the mover’s insurance cover for transit
  • Inform clients, couriers and banks of the new address and the move date

Weeks 4–2: prepare

  • IT: full backup of servers and shared drives; label every cable and port
  • Records: box files by department and year; seal and number each record box
  • Hand each employee crates and labels; set a packing deadline
  • New premises: install network, test power at every desk, set up access control
  • Update GST, shops and establishment and other registrations with your CA as required
  • Write the move-day runbook (below) and share it

Week 1: final checks

  • Confirm the mover, truck count, loading times and building permissions at both ends
  • Book lifts and loading bays with both building managements
  • Print a floor plan with desk codes for every floor at the new office
  • Tell employees what to take home (personal items, laptops if working from home)

How to label crates and assets

A label should answer three questions at a glance: which floor, which team, which desk. Use the same code on the crate, on the floor plan at the new office, and on the desk itself.

  • Format: FLOOR-TEAM-DESK, e.g. F2-SALES-07; record boxes as REC-FIN-2023-04
  • Label two sides of every crate, never only the top
  • Colour-code by floor so movers can sort without reading
  • Keep a list of every code: what it contains and where it should land

Copy the table below into a spreadsheet as your master list.

CodeContentsFromToPacked byArrivedCondition
F2-SALES-07Monitor, keyboard, filesOld 4th floor, desk 31New 2nd floor, desk 07Riya✓OK
REC-FIN-2023-04Vouchers Apr–Jun 2023Record roomArchive cabinet B, shelf 2Accounts

WhatsWhere can keep this list for you from photos. Rename each crate to its code, photograph it as it is packed and the AI lists what is inside; print QR labels that show the contents when scanned; and run the move as one trip with progress you can see — packing, sealed, arrived, unpacked. At the new office, map cabinets from a photo so record boxes go into a named shelf. Afterwards, the “where everything went” report exports a CSV for admin and finance. It is a move-and-storage record, not an IT asset-management system — keep serial numbers and assignments in your IT register.

Move-day runbook

  1. Friday evening: shut down systems in order; IT disconnects and packs servers and network gear; employees leave sealed, labelled crates at their desks.
  2. Loading: one person at the old office checks each crate code against the list as it leaves; IT equipment travels in its own vehicle where possible.
  3. Unloading: one person per floor at the new office directs crates to desks using the floor plan.
  4. Saturday: IT brings up the network, servers and printers; test every desk’s power and network point.
  5. Sunday: furniture placed, crates at desks, signage up, pantry stocked; walk-through with team coordinators.
  6. Monday morning: an IT and admin help desk on every floor for the first two days.

Post-move audit (first two weeks)

  • Every coded crate and asset ticked as arrived; chase anything missing the same week
  • Damage checked against the before-move photos; claims raised with the mover within their deadline
  • Record boxes in the archive and the shelf list updated
  • Old premises restored, keys and access cards returned, final meter readings and handover signed
  • Security deposit claim filed with the landlord
  • A short note on what to do differently next time

Run the office move as one trip you can see

Rename crates to their desk codes, photograph each as it is packed, print QR labels, and track the move from packing to unpacked. Afterwards, export a CSV of where everything went. Invite team coordinators to record, and management to look only.

Common questions

How far in advance should an office relocation be planned?

About 12 weeks for a small or mid-sized office: time for the lease, movers, internet installation, inventory and tagging, and registration updates. Larger moves need longer.

What should be on an office relocation checklist?

Owners for each stream, lease and vendor bookings, a full asset inventory with tags, IT backup and network setup, records boxed and numbered, a desk-wise floor plan, a move-day runbook, and a post-move audit.

How do you label office furniture and IT equipment for a move?

Use a FLOOR-TEAM-DESK code on two sides of every crate and asset, colour-coded by floor, matching a floor plan at the new office and a master list of what each code contains.

Who is responsible for IT assets during an office move?

Name an IT lead who owns backup, disconnection, transport and reconnection of IT equipment, and a person at each end who checks every coded item out and in.

How do you avoid downtime when shifting an office?

Move over a weekend, book the new internet line weeks ahead, back up before shutting down, test every desk’s power and network on Saturday, and staff a help desk on Monday.

Is there an office relocation checklist in Excel?

Copy the master-list table on this page into a spreadsheet. If you track the move in WhatsWhere, its “where everything went” report exports a CSV that opens in Excel.